Kassam Stadium, Oxford

Project Type

Project Type

Cut Edge Corrosion Treatment

Contract Type

Contract Type

Sub-Contractor

Contract Value

Contract Value

£30,000

Work Overview

  • Application of Giromax® Edgecoat on approximately 1,500 linear meters of cut edge corrosion
  • Fully certified and safe high-level installation

 

Testimonial

“Another seamless project by your lads, good job.”

|

Jim Ballard (Contracts Manager – Premierseal)

Full Project Breakdown

Tritec Building Contractors were appointed as the main approved installer for Oxford FC at Kassam Stadium, following a successful tender process. The project was awarded as a sub-contract through Premierseal, with the scope covering just under 1,500 linear meters of cut-edge corrosion treatment using Giromax® Edgecoat.

Given the high-level nature of the works, our operatives undertook all tasks using full-body harnesses, lanyard restraints, and fall arrest blocks, all connected to a tested and certified man-safe running line. Our team is fully trained in working at height safely, ensuring that all operations were completed without incident.

The Giromax® Edgecoat system was applied in accordance with the manufacturer’s specifications, providing durable, long-term corrosion protection for all exposed cut edges on the stadium roof and steelwork.

Upon completion, the client received a 10-year manufacturer-backed Giromax guarantee, providing assurance of the system’s longevity and the high standard of workmanship delivered by Tritec.

Gallery

Download Our Brochure

With decades of experience, Tritec has earned a reputation as one of the UK’s most trusted industrial and commercial roofing contractors.

Download Our Brochure