Waitrose Distribution Centre, Aylesford

Project Type

Project Type

Commercial warehouse roof refurbishment

Contract Type

Contract Type

Sub-Contractor

Location:

Location:

Aylesford

Work Overview

DriSilane® ReCote application on an 8,000 m² roof system

Full Project Breakdown

Tritec was appointed as the subcontractor for an 8,000 m² roof refurbishment at the Waitrose Distribution Centre in Aylesford, completed between September and November 2025. The project focused on extending the life of the warehouse roof, improving weatherproofing, and enhancing durability.

Roof Preparation & Corrosion Repair

All roof surfaces were cleaned and inspected, removing dirt, moss, algae, loose coatings, old sealants, and debris. PVDF areas were primed, rooflights and sheets were solvent-wiped and keyed, and damaged or corroded fixings were repaired or replaced. Corroded fixing heads were stabilised with Drisilane® Prime. Cut-edge corrosion repairs were completed to all roof sheets and flashings, creating a consistent and durable base.

Roof Coating Application

Once preparation was complete, a uniform coat of Drisilane® Prime was applied, extending onto surrounding areas. Sheet and flashing end-laps were sealed with Drisilane® RS and Flex, forming a continuous protective band. The final DriSilane® Elite coat was applied across the roof at a minimum wet film thickness of 300 μm, ensuring long-term durability, weather resistance, and enhanced lifespan for the warehouse roof system.

Project Outcome

The refurbishment delivered a robust, watertight roof with long-lasting protection. Tritec’s thorough preparation and application of the DriSilane® ReCote system provided Waitrose with a durable, low-maintenance solution, extending the roof’s serviceable life and maintaining optimal performance for years to come.

Gallery

Download Our Brochure

With decades of experience, Tritec has earned a reputation as one of the UK’s most trusted industrial and commercial roofing contractors.

Download Our Brochure